A flooded tunnel between St Pancras and Farringdon stations is still causing delays on the Thameslink line.
Commuters at Wimbledon this morning were told that Thameslink services to Waterloo were cancelled.
From Friday: Travel chaos after burst water main in rail tunnel
Trains to Sutton via St Helier were meant to be running but the 8.04am train to Sutton listed on the electronic notice board did not turn up. A station announcer said the trains would arrive at 8.13am.
A later 8.32am to Sutton had already been cancelled.
Passengers heading to Luton were being told to find alternative routes.
Updated: Thameslink said this morning it was pumping 28,000 litres of water an hour with an estimated 250,000 litres to move. A picture tweeted below showed the depth of water removed since 11.25am
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules hereLast Updated:
Report this comment Cancel